1.
The battery check, sealed source check, and calibration are three different quality control procedures performed to ensure proper operation of the:
2.
If generator elute contains 635 mCi of Tc-99m, what is the maximum amount of Mo-99 allowed? (0.15 uCi Mo-99 per mCi Tc-99m)
3.
All of the following single photon emission computed tomography (SPECT) quality control procedures can be performed by the technologist EXCEPT:
4.
When performing daily intrinsic floods, a point source of Tc-99m is placed five crystal dimensions away and centered over the detector. A point source should produce a measured counting rate not greater than:
5.
All of the following quality control (QC) tests are performed in nuclear medicine department to assess the reproducibility of radiation counter EXCEPT:
6.
Which of the following is a gas-filled radiation survey instrument?
7.
The extrinsic flood image evaluates the uniformity of:
8.
The blank scan is performed daily on Positron Emission Tomography (PET) scanners using a Ge-68 transmission source. The term blank scan reflects:
9.
Well Counter (WC) and Uptake Probe (UP) are two detectors commonly configured to a single computer. Which of the following statements describing their properties is INCORRECT?
10.
Calibration, sensitivity/constancy, efficiency, chi-square, and energy resolution are quality control procedures performed to ensure proper operation of the:
اترك تعليقاً